Category Archives: New build

Equality & Diversity Award for Bournville College

IID
Posted: Mon 1st October 2012

Bournville College is the first College in Birmingham to receive The Investors in Diversity – Stage 2 recognition… Read on…

Hair raising charity event at the new Bournville College

Hair
Posted: Wed 27th July 2011

The construction team responsible for building the new £66 million Bournville College at Longbridge in Birmingham took time out recently to have their hair cut in aid of charity. Students studying hairdressing at Bournville College visited the site of the … Read on…

Posted in: Hairdressing, New build, The College, Uncategorized | Comments Off »

Architect’s blog – continued

Salim
Posted: Fri 15th July 2011

The last few months have been very busy. You may have noticed that the external envelope of the building is now nearly complete meaning the building is practically watertight. This has allowed us to start decorating and carpeting the internal … Read on…

Posted in: New build, The College | 1 Comment »

Locking time in a time capsule

Time-capsule
Posted: Tue 12th July 2011

Students of Bournville College have celebrated the burial of a time capsule at the new £66 million campus in Longbridge. In the years to come, the time capsule will reveal its contents and provide an interesting guide of the history of Bournville College and Longbridge. Read on…

Tags: , , Posted in: New build | Comments Off »

News from the building site – April 2011

New-build_1
Posted: Tue 5th April 2011

The Bournville College site has made considerable progress since the last blog update. The building is becoming progressively watertight as the cladding to all areas nears completion. The frame for the glazing at the west end of the spine has … Read on…

New campus reaches major development milestone

topping-out-2
Posted: Thu 17th February 2011

Construction of the brand new £66 million Bournville College at Longbridge has reached an important milestone, with developer St. Modwen, Shepherd Construction and the College celebrating the topping out of the development. Marking the completion of the six-storey structural frame, … Read on…

Architect’s blog

Salim
Posted: Wed 2nd February 2011

Hello, my name is Salim and I am the Architect for the new Bournville College’s campus in Longbridge. My role was to design the campus and now work with the College and the main contractor to transfer the design from paper into a real-life building. January … Read on…

Posted in: New build | 1 Comment »

Bournville College unveils its new logo

unveils-its-new-logo
Posted: Tue 30th November 2010

In preparation for the big move to a £66 million new build campus in September 2011, Bournville College unveiled its new logo on 1st December. The logo has been revealed for the first time on the new Bournville College’s website … Read on…

Bournville students visit the new build site for the first time

art-students-new-build
Posted: Tue 30th November 2010

The very first group of Bournville College students was given a unique opportunity to visit the construction site of their new £66 million campus in Longbridge. Students Toni Stewart, Ashley Mullaney, Dan Bellenger, Tamara Pulley and Roberta Harrhoff, all studying … Read on…

Tags: , Posted in: art & design, New build | Comments Off »

News from the building site

New-build
Posted: Mon 22nd November 2010

I’m a trainee quantity surveyor, working for Shepherd Construction and I thought I would keep you posted on the latest developments on the site, as we work hard to build the new campus for Bournville College. September You might have … Read on…

Tags: Posted in: New build, The College | 2 Comments »